Gravel Roadside Parking Pad & Pathway | Eco Upgrades
Core Product: CORE 65-30 Heavy Duty Grid + CORE 38-18 Light Duty Grid
Installation Method: DIY
CORE Gravel 65-30 was used to create a stabilized gravel parking pad, and CORE 38-18 Light Duty was used for the pathway for tennants and visitors. The foundation system allowed the clients to create an appealing and stable parking area for guests. CORE Glow was added to illuminate the pathway to the home enterance! We call this the full CORE Treatment.