Install Guide

Install Guide

CORE Grass Installation Guide

1) Create a sub-base suitable for the intended traffic load taking into account your sub soil ground conditions, then blend over the sub base with sharp sand and soil (60/40 ratio) to form a continuous smooth base level.
2) Lay the grids and clip together to form one continuous matrix.
3) Fill the grids with structural soil (recipe supplied by CORE Gravel) and damp down with water to allow the soil to settle into the cells.
4) Surface-dress the cells by covering with approximately 10-15mm of a mixture as per CORE Gravel structural soil mix recipe.
5) Seed the area and water thoroughly. To aid grass growth, cover the seed with a top layer of fertilizer and water regularly for a period of 4 to 6 weeks.

PDF Resource Links

CORE Grass™ Specifications and Install Guides


We are the Canadian/US Distributors for the CORE Gravel™ product line. 
Contact us for an estimate on a project or to purchase our materials for your personal or civic project.

Certified B Corporation Canadian Women Brand 1% for the Planet Small Business Best Innovation

In Support Of: