1. PREPARE A FIRM BASE

Prepare the ground to a “firm underfoot” condition. Dependent on soil condition, this may require a thin layer of hardcore. Now simply level over with approximately 10-20mm of sand.

Estimated prep time - 20 mins per pack

2. CLIP THE PANELS IN PLACE

Clip the panels in place with the geotextile membrane face down. Cut the interlocked panels to shape with pruning shears or a utility knife using protective gloves to avoid abrasions.

Estimated prep time - 10 mins per pack

3. FILL THE CELLS

Fill the CORE Path hexagon cells with your chosen gravel (suggested gravel size 6 to 12mm). Then brush over the gravel, covering CORE Path by approx. 10mm, so the hexagon cells are just out of sight.

Estimated prep time - 5 mins per pack


Click Here for a CORE Path Install Guide.

Click Here for CORE Path Specifications.

We are the Canadian/US Distributors for the CORE Gravel product line. 

Contact us for an estimate on a project or to purchase our materials for your personal or civic project.